Russian version
 Equipment's prices 
Documentation and balancing and commissioning
Code Name Price, rub. Note
0101 Technological documentation set 32000 Technological conditions. Map of technological process. Description of production's technology.
0501 Affixment of technological equipment to the location, list of necessary standard equipment 25600 Including specifications and executive schemes
0601 Equipment's assembling 80000
0701 Starting-up and adjusting 16000 Staff training and consultations are included in cost. Pay after start production.

Code Name Price, rub. Note
1104 Block form pumping plant (360 kg) 59600 Use for increase productiveness of block form.
1101 Preliminary foaming machine (530 kg) 132500 Productiveness 10 m3/hour (mark 15,25); 12-15 m3/hour (mark 35,50) photo scheme
1102 Block form - 0,5 m3/cycle (1500 kg) 294400 Duration of total cycle: without pumping - 20 min (productiveness - 1,5 m3/hour). with pumping- 7 min (productiveness - 4,5 êóá ì/÷àñ) photo scheme
1103 Semiautomatic system of pneumatics control (40 kg) 32750 Control panel of form's pneumatic, vertical cutting, pumping plant, charging fan of block form.
1105 Bunker of endurance-dispensing 18300 Volume 40 m3 for one shift of workshop, 80 m3 for two shift, 120 m3 for three shift photo
1106 Fan of pneumatic transport 9000 3 items - 24 000 rub.
1107 Plant for vertical blocks cutting (235 kg) 58880 Productiveness - not less 4,5 m3/hour photo scheme
1108 Plant for block cutting on sheets (120 kg) 58880 Productiveness - not less 4,5 m3/hour photo scheme
1110 Compressor- 10,7 atm. 16000 Photo
1111 Airway PVH(flexible pipe) 640 For set - 15 items (9 600 rub)
1112 Polypropylene airway 160 For set - 40 items (6 400 rub)
1113 Armature 110 For set - 40 items (4400 rub)
1114 Steam generator (steam boiler) 118400
1115 Cable production 32 For set 100 r.m. (3 200 rub)
1116 Other componentry (pipe-bends, cranes, set-downs, hoses and so on) 9600 Price for set
1117 Crush plant 58880 Photo
1118 Steam store 76800 2õ0,7m3 work pressure 6 atm.
1119 Water-pipe and steam-pipe 0 VSD doesn't supply
Foaming polystyrene
Equipment for polystyrene
Equipments prices
Heat insulation
Business plan
Photo gallery
Rambler's Top100